Project Overview
Ice Rink Chiller Industry and application. An indoor ice rink operated by a leisure and sports company inside a shopping mall. The rink is a 30 × 15 m sheet (450 m²) with 30 mm of ice over a concrete pad, cooled through a polyethylene brine grid cast into the slab. Public sessions run seven days a week, with figure skating and junior hockey training in the early mornings.
Pain points. The rink was running on a used air-cooled chiller inherited from the previous tenant, and the operation had settled into a routine of workarounds:
- Ice surface temperature drifted from −5 °C in the morning to about −3 °C by mid-afternoon. The surface went soft, skate edges cut deep grooves, and the ice near the resurfacer gate turned slushy within an hour of a busy session.
- The existing unit tripped on high pressure whenever the plant room passed 35 °C. That happened most weekends, which is when the rink is full.
- Resurfacing recovery took 15 to 20 minutes. Session slots had to be spaced around it, and the schedule slipped every Saturday.
- The hall runs at 30 °C and 80 % relative humidity. Cold surfaces fogged, the dasher boards stayed wet, and ice fog hung over the sheet during humid evenings.
- Electricity cost and service calls were both climbing, and nobody could say what the unit was actually delivering at site conditions.
Project location. Southeast Asia, tropical climate, 32 to 35 °C ambient year-round with high humidity.
Requirements
- Cooling object. 450 m² ice pad, 30 mm ice thickness, brine grid embedded in the concrete slab.
- Temperature range. Brine supply −11 °C, return −8 °C at design load; ice surface to be held at −5 °C.
- Flow. At least 18 m³/h through the rink grid, 30 % propylene glycol as the secondary refrigerant.
- Site conditions. Plant room adjacent to the rink, indoors but poorly ventilated, 32 to 35 °C in the afternoon. A cooling tower loop was already available on the roof at 35 / 40 °C.
- Other constraints. Noise had to stay inside the plant room (retail units above and beside it), the facility team is small and needs remote alarms, and the electrical supply is 380 V / 50 Hz / 3 phase.
Our Solution
Unit selected. A water-cooled low-temperature glycol chiller, nominal 62 kW at −11 °C leaving brine and 35 °C condensing water inlet. Two scroll compressors, 30 kW installed compressor power, staged loading.
Configuration.
- Stainless steel plate evaporator, low-temperature design, with antifreeze thermostat and flow switch protection.
- Shell-and-tube condenser on the existing tower loop, 35 / 40 °C, so the machine does not depend on plant-room air temperature.
- Insulated 500 L buffer tank between chiller and rink grid, sized to absorb the water a resurfacer discharges in a single pass.
- Brine pump 18 m³/h at 25 m head, and a PLC holding the leaving brine temperature to ±0.5 K with the sensor at the outlet header.
- Remote alarm by email and SMS, plus a local HMI showing brine in/out temperatures, condenser water temperatures and compressor status.
Why this configuration, against the specific pain points.
- Afternoon ice drift came from ambient-driven condensing pressure. A water-cooled condenser is referenced to the tower loop rather than the room, so the machine’s capacity no longer follows the plant-room thermometer.
- Weekend high-pressure trips were the same problem expressed as a fault. With condensing temperature held near the tower’s 35 °C, the head pressure ceiling is no longer reached on a hot afternoon.
- Slow resurfacing recovery is a thermal mass question rather than a capacity question. The staged compressors carry the base load economically, and the buffer tank lets both stages run flat out for the ten minutes after a flood without short cycling.
- Fog and wet boards are a humidity problem, and no chiller fixes them alone. The brine loop was kept at a stable temperature and the hall dehumidifier was resized separately (to 60–65 % RH), which removed the fog without pushing the ice colder than it needed to be.
Unclear performance was answered by writing the capacity, the brine temperature and the condenser water temperature onto the commissioning sheet, at site conditions.
Key Technical Parameters
| Item | Specification |
| Nominal cooling capacity | 62 kW at −11 °C leaving brine, 35 °C condensing water inlet |
| Compressors | 2 × scroll, staged, 30 kW total input |
| Refrigerant | R404A |
| Leaving brine temperature | −11 °C, adjustable −15 to −5 °C |
| Secondary refrigerant | 30 % propylene glycol |
| Brine flow | 18 m³/h at 3 K temperature rise |
| Evaporator | stainless steel plate, low-temperature design |
| Condenser | shell-and-tube, cooling tower loop, 35 / 40 °C |
| Buffer tank | 500 L, insulated |
| Temperature stability | ±0.5 K at outlet header, steady load |
| Control | PLC, remote alarm, local HMI |
| Power supply | 380 V / 50 Hz / 3 phase |
| Protection | antifreeze, flow switch, high/low pressure, phase sequence |
Figures above are the project setpoints and reference values at the stated conditions. Site measurements are taken at the outlet header, not at the rink grid.
Project Photos


Results & Benefits
- Temperature holds. Ice surface measured at −5 °C ±0.5 K across five points on the pad, morning and late afternoon. The old afternoon drift is gone.
- Session schedule recovered. Resurfacing recovery fell from 15–20 minutes to 6–8 minutes, which returned two session slots per day at weekends.
- No pressure trips. Fourteen months in service without a high-pressure trip, including the hottest week of the year.
- Energy. Compressor input logged at about 19 kW average against an average brine load of 44 kW over a 30-day period, roughly a 15–18 % reduction against the air-cooled unit it replaced at the same nominal duty.
- Maintenance. Two scheduled visits in fourteen months: condenser cleaning and a brine filter change. No compressor work, no refrigerant top-up beyond the initial charge.
- Operational visibility. The facility team reads brine and condenser temperatures from the HMI each morning, which ended the practice of guessing whether the ice was “cold enough”.
Testimonial
“The ice finally behaves the same on a Sunday afternoon as it does on a Tuesday morning. Resurfacing water freezes before the next group comes on, and we have not had a high-pressure trip since the unit went in.”
— Facility Manager, ice rink operator
CTA
Share your cooling requirement with us, we provide customized chiller solution.
Three items still need action before this goes live: the photo slots must be filled with the real project photographs (the three files above are diagrams and scene renders, not site photos), the model code has to be inserted from the order, and the figures in Results & Benefits have to be checked against the commissioning report and the customer’s electricity log.